¡¡The
downtown center of Huzhou will be enlarged to a great extent,
from the total area of 25 square kilometer to 38.2 square
kilometer. Thus the urbanization will be 42% after
the
new Ren Huangshan Development is put into use. The construction
of the infrastructure system is supposed to absorb 3.5 billion
dollars within the period of 5 years, according to the municipal
plans. At the same time, the attention will also be paid
to the central area reconstruction for the benefits of the
residence.
¡¡The
whole municipal investment is to be put into different constructions.
First of all, the transportation network will be greatly
improved especially the highway paving. The city will increase
the road to 2800 kilometers, among which the express highway
will be expanded from
198
km to 585km within the area of the city. In this respect,
it will take one hour at most from the downtown area to
the neighboring counties. The key projects within the five
years will consist of Hangzhou-Ningbo Highway, Xinyi (Jiangsu
province)-Changxin (Huzhou) Railway, the Grand Canal of
Peking-Hangzhou as well as standard container transportation
hubs. Less important roads include Xinshi-Wukang-Dipu Highway,
Shanghai-Suzhou-Zhejiang-Anhui Highway, Shaghai-Jiaixng-Huzhou
Highway from the east to west, crossing the area of Huzhou.
From North to south, we have four highways under construction,
ie Hanghzou-Nanjing Highway, Hangzou-Changxin Highway, Yuhang
section of Shanghai-Jiaxing Highway and the Grand Way crossing
Taihu Lake. With these transportation network put into operation,
it will improve environment of industry.
¡¡Energy
is both essential and vital to the whole industry. According
to the program ,several power plants has been or will be
built soon, including two hydroelectric,ie Tian Huangping
pumped storage plant, the
fourth
phase of the Changxing Power Station,etc. Up to now the
electricity network of the urban and the suburb has been
updated and improved. Consequently both urban residents
and villagers are enjoying the same price of the electricity.
Several other power projects are under construction. For
example, two power substations will be set up in Shanlian
and Daixi separately with the power of 500KVA for each and
4X750000KVA for the master capacity. It is estimated that
by the end of 2020 there will be 2 stations of 500KVA and
13 ones of 220KVA. Besides these hydroelectric stations,
there are two thermal power stations(Nanxun Thermal Power
Station and Universal Energy which have been put into practical
use and four thermal power station under planning, namely
Mizuda Thermal Power Station, Zhili Thermal Power Station,
Lianshi Thermal Power Station and Sanxian Thermal Power
Station
¡¡In
the meantime, the government pays attention to the drainage
and flood protection system as well as internet system for
the convenience of the investors.
¡¡Huzhou
is the ideal place for the investors to live in as she enjoys
the attractive resort and picturesque landscape. After many
years of improvement of the environment, the continual planting
of the trees and flowers, the surrounding is quite charming
to the residents. Up to now there are 2827.3KM2 of forests,
covering 48.6% of the whole land. Besides, there are 0.13
million hectares of ecological woodlands that have reached
the national standards.